BECC Development · Turks and Caicos

Build with confidence.

Build a preliminary project budget for a property in the Turks and Caicos Islands. Adjust your assumptions and see how building costs, site preparation, professional fees and optional features affect the total.

Early-stage planning tool · USD

1. Your building

Building rates supplied by BECC are for guidance only. Specification levels are approximate. Confirm the detailed turnkey scope before publication.

2. Site preparation

Enter the lot size and the proportion of the lot affected by each activity. Routine rates are calculated per square yard. Areas can overlap only where the work genuinely requires it.

Add exceptional site works

These works cannot be reliably estimated automatically. Enter a project-specific allowance only if known.

Routine rates exclude exceptional rock excavation, retaining walls, significant drainage, difficult access and other site-specific works. Foundations are already included in the turnkey building rate and must not be added again.

Personalize your estimate

Customize Your Outdoor Living

Add the outdoor features you want for your property. The standard external-works package is shown separately from optional extras.

✓
Standard External Works

Driveway and parking · Boundary walls/fencing · Entrance gate · Garden and driveway lighting

Building-perimeter lighting remains included in building MEP.
Review standard package allowances

These allowances are editable. Boundary walls/fencing are calculated from the length entered.

Rate: $300 per linear foot. Enter the required length.

Add optional outdoor features

Select a feature to include it in your estimate. Select it again to remove it.

Swimming Pool

$45,000–$60,000

Optional

Concrete pool allowance, excluding the deck.

Pool Deck / Outdoor Terrace

$8 per sq. ft.

Optional

Enter the deck or terrace area to calculate the allowance.

Calculated at $8 per sq. ft.

Landscaping & Planting

$25,000–$35,000

Optional

Lump-sum allowance for landscaping and planting.

The standard package and optional features are calculated separately. Only selected items are included in the total. These are preliminary budgeting allowances, not fixed quotations.

4. Utilities and connections

Enter individual service allowances instead

Untick the typical allowance to use these fields instead. Do not count the same connection twice.

The standard allowance assumes services are readily available. Long extensions or unusual wastewater and electrical requirements need individual assessment.

5. Professional fees and approvals

Professional fees are calculated as a percentage of the low/high building construction cost. Rates are editable.

Planning and approvals

Professional fees and statutory charges vary by project. Confirm scope and current fees with the relevant professionals and authorities.

6. Furnishings and equipment

Furnished: furniture, beds, seating, dining furniture and window treatments. Fully equipped: furnishings plus kitchenware, small appliances, linens, towels and operating essentials. Options are alternatives, not cumulative.

7. Import and logistics

Manually enter an allowance for freight, shipping insurance, customs-related charges and other import logistics only where not already included in supplier, turnkey or other costs. The TCI Customs calculator is linked in the results panel.

8. Optional land acquisition

Enter the amount confirmed using the official TCI stamp-duty calculator.

Stamp duty is entered separately. Do not estimate it using a universal percentage; check the applicable amount for your transaction using the official TCI calculator.

9. Contingency

BECC recommended preliminary default: 5%. Applied to eligible development costs before land acquisition. Adjust as appropriate to the project's level of definition and risk.

ESTIMATOR PREVIEW · These are preliminary budgeting allowances. Confirm rates, scope and exclusions before relying on the result for a financial commitment.