Build with confidence.
Build a preliminary project budget for a property in the Turks and Caicos Islands. Adjust your assumptions and see how building costs, site preparation, professional fees and optional features affect the total.
Early-stage planning tool · USD1. Your building
Building rates supplied by BECC are for guidance only. Specification levels are approximate. Confirm the detailed turnkey scope before publication.
2. Site preparation
Enter the lot size and the proportion of the lot affected by each activity. Routine rates are calculated per square yard. Areas can overlap only where the work genuinely requires it.
Add exceptional site works
These works cannot be reliably estimated automatically. Enter a project-specific allowance only if known.
Routine rates exclude exceptional rock excavation, retaining walls, significant drainage, difficult access and other site-specific works. Foundations are already included in the turnkey building rate and must not be added again.
Customize Your Outdoor Living
Add the outdoor features you want for your property. The standard external-works package is shown separately from optional extras.
Driveway and parking · Boundary walls/fencing · Entrance gate · Garden and driveway lighting
Building-perimeter lighting remains included in building MEP.Review standard package allowances
These allowances are editable. Boundary walls/fencing are calculated from the length entered.
Add optional outdoor features
Select a feature to include it in your estimate. Select it again to remove it.
Swimming Pool
$45,000–$60,000
Concrete pool allowance, excluding the deck.
Pool Deck / Outdoor Terrace
$8 per sq. ft.
Enter the deck or terrace area to calculate the allowance.
Calculated at $8 per sq. ft.
Landscaping & Planting
$25,000–$35,000
Lump-sum allowance for landscaping and planting.
The standard package and optional features are calculated separately. Only selected items are included in the total. These are preliminary budgeting allowances, not fixed quotations.
4. Utilities and connections
Enter individual service allowances instead
Untick the typical allowance to use these fields instead. Do not count the same connection twice.
The standard allowance assumes services are readily available. Long extensions or unusual wastewater and electrical requirements need individual assessment.
5. Professional fees and approvals
Professional fees are calculated as a percentage of the low/high building construction cost. Rates are editable.
Planning and approvals
Professional fees and statutory charges vary by project. Confirm scope and current fees with the relevant professionals and authorities.
6. Furnishings and equipment
Furnished: furniture, beds, seating, dining furniture and window treatments. Fully equipped: furnishings plus kitchenware, small appliances, linens, towels and operating essentials. Options are alternatives, not cumulative.
7. Import and logistics
Manually enter an allowance for freight, shipping insurance, customs-related charges and other import logistics only where not already included in supplier, turnkey or other costs. The TCI Customs calculator is linked in the results panel.
8. Optional land acquisition
Stamp duty is entered separately. Do not estimate it using a universal percentage; check the applicable amount for your transaction using the official TCI calculator.
9. Contingency
BECC recommended preliminary default: 5%. Applied to eligible development costs before land acquisition. Adjust as appropriate to the project's level of definition and risk.
ESTIMATOR PREVIEW · These are preliminary budgeting allowances. Confirm rates, scope and exclusions before relying on the result for a financial commitment.